Close Menu
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Facebook X (Twitter) Instagram
Trending
  • Gamble Caribbean Hold’em Casino poker on the internet pokie
  • Better No deposit Local casino Bonuses 2024 » 100 percent free Bucks & Free Spins
  • The Increase of Student-Driven Encyclopedias: Changing Understanding Landscapes
  • Finest Cellular Casinos: Greatest Us Cellular Gambling enterprise Applications and Advertisements within the 2025
  • Best Mobile Web based poker Software the real deal Cash on apple’s ios & Android os within the 2025
  • Greatest ten Online gambling Programs for real Cash in 2025
  • Casino utan svensk licens 2025 – Topp 10 casino utan Spelpaus
  • Bet with Sahabet 💰 Bonus up to 10000 Rupees 💰 Play Online Casino Games
Telangana Press
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Telangana Press
Telugu today

Old city metro rail foundation stone to be laid on March 8-Telangana Today

TelanganapressBy TelanganapressMarch 4, 2024No Comments

The metro rail project is expected to cost about Rs. 2,000 Cr including for road widening and shifting of the utilities.

Published Date – 4 March 2024, 05:30 PM


Old city metro rail foundation stone to be laid on March 8


Hyderabad: The foundation stone the for phase I Hyderabad metro rail work in a 5.5 km stretch from MGBS to Falaknuma, which is part of corridor II green line JBS to Falaknuma will be laid on Friday, March 8. According to MD, HMRL NVS Reddy, around 1100 properties will be affected in road widening at the metro rail station locations. The metro rail project is expected to cost about Rs. 2,000 Cr including for road widening and shifting of the utilities, he stated.

The metro rail alignment will pass through Darulshifa – Puranihaveli – Etebarchowk – Alijakotla – Mir Momin Daira – Haribowli – Shalibanda – Shamsheergunj – Aliabad and end at Falaknuma Metro Rail station as originally planned. There would be 4 stations namely Salarjung Museum, Charminar, Shalibanda and Falaknuma. Though the alignment and the stations are about 500 metres away from the monuments, two of the stations are named after Salarjung Museum and Charminar due to their historical importance, NVS Reddy said.


The MD indicated that engineering solutions are being worked out to ensure that no religious or heritage structure is affected in this stretch either in road widening or in Metro Rail construction. The line will be further extended by another 1.5 km from Falaknuma to Chandrayangutta, which will be developed as a major interchange station on the newly planned Airport line of Nagole – LB Nagar – Chandrayangutta – Mailardevpally -P7 Road – Shamshabad Airport, he added.

Chief Minister, A Revanth Reddy will lay the foundation stone for the project.

Source link

Telanganapress
  • Website

Related Posts

KCR’s speech gets roaring response from people-Telangana Today

April 16, 2024

More of the same-Telangana Today

April 16, 2024

Property tax cheques bounce, GHMC takes action-Telangana Today

April 16, 2024
Leave A Reply Cancel Reply

Categories
  • 1
  • AI News
  • News
  • Telugu today
  • Uncategorized
  • తాజా వార్తలు
  • వార్తలు
కాపీరైట్ © 2024 Telanganapress.com సర్వ హక్కులు ప్రత్యేకించబడినవి.
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • About us
  • Contact us

Type above and press Enter to search. Press Esc to cancel.