Close Menu
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Facebook X (Twitter) Instagram
Trending
  • Gamble Caribbean Hold’em Casino poker on the internet pokie
  • Better No deposit Local casino Bonuses 2024 » 100 percent free Bucks & Free Spins
  • The Increase of Student-Driven Encyclopedias: Changing Understanding Landscapes
  • Finest Cellular Casinos: Greatest Us Cellular Gambling enterprise Applications and Advertisements within the 2025
  • Best Mobile Web based poker Software the real deal Cash on apple’s ios & Android os within the 2025
  • Greatest ten Online gambling Programs for real Cash in 2025
  • Casino utan svensk licens 2025 – Topp 10 casino utan Spelpaus
  • Bet with Sahabet 💰 Bonus up to 10000 Rupees 💰 Play Online Casino Games
Telangana Press
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Telangana Press
Telugu today

Mancherial: High-rise bridge works across Godavari gaining momentum

TelanganapressBy TelanganapressJune 7, 2023No Comments

Viaduct across Godavari approved at estimated cost of Rs 1.25 crore, cost of facility revised up to Rs 1.65 crore

Post Date – 08:20 PM, Wednesday – 07/06/23

Mancherial: High-rise bridge works across Godavari gaining momentum

The proposed viaduct is located on the Godavari riverbed near Mancherial and is currently undergoing soil testing.

Mancherial: The long-awaited Godavari River Viaduct between Mancherial and Anthargaon in Peddapalli district has finally progressed.

Chief Minister K Chandrashekhar Rao announced the high-rise bridge across Godavari while speaking at a voting rally at the Mandar Center in Naspur in 2018. As a result, the bridge was approved at an estimated cost of Rs. 1.25 billion. The cost of the facility has been revised up to Rs 1.65 crore.

Received administrative approval and called for tender in 2022. Vallabha Constructions Private Limited had previously packaged the work for erecting a high-rise bridge across Pranahita in Gudem village, Chintalamanepalli mandal, Kumram Bheem Asifabad district. Soil testing has already begun at the site for the construction of the bridge. Another soil test is being carried out at the bridge’s columns.

The chief minister is scheduled to lay the foundation stone for the facility’s works on June 9.

With the advent of this facility, the travel distance between Mancherial, Peddapalli and Karimnagar will be reduced by about 20 km. Currently, motorists are forced to take the Godavarikhani-Ramagundam route to reach Peddapalli and Karimnagar.

Source link

Telanganapress
  • Website

Related Posts

KCR’s speech gets roaring response from people-Telangana Today

April 16, 2024

More of the same-Telangana Today

April 16, 2024

Property tax cheques bounce, GHMC takes action-Telangana Today

April 16, 2024
Leave A Reply Cancel Reply

Categories
  • 1
  • AI News
  • News
  • Telugu today
  • Uncategorized
  • తాజా వార్తలు
  • వార్తలు
కాపీరైట్ © 2024 Telanganapress.com సర్వ హక్కులు ప్రత్యేకించబడినవి.
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • About us
  • Contact us

Type above and press Enter to search. Press Esc to cancel.