Close Menu
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Facebook X (Twitter) Instagram
Trending
  • Gamble Caribbean Hold’em Casino poker on the internet pokie
  • Better No deposit Local casino Bonuses 2024 » 100 percent free Bucks & Free Spins
  • The Increase of Student-Driven Encyclopedias: Changing Understanding Landscapes
  • Finest Cellular Casinos: Greatest Us Cellular Gambling enterprise Applications and Advertisements within the 2025
  • Best Mobile Web based poker Software the real deal Cash on apple’s ios & Android os within the 2025
  • Greatest ten Online gambling Programs for real Cash in 2025
  • Casino utan svensk licens 2025 – Topp 10 casino utan Spelpaus
  • Bet with Sahabet 💰 Bonus up to 10000 Rupees 💰 Play Online Casino Games
Telangana Press
  • Telugu today
  • తాజా వార్తలు
  • వార్తలు
Telangana Press
Telugu today

Shilpa Layout overpass completed

TelanganapressBy TelanganapressNovember 8, 2022No Comments

Post Date: Post Date – 11:30pm, Monday – November 7th

Hyderabad: Shilpa Layout flyover to be completed

The Shilpa Layout overpass is 956 meters long and 16.60 meters wide, connecting Hitec City and the financial district.

Hyderabad: The four-lane two-way interchange from Shilpa Layout to the Outer Ring Road (ORR) near Gachibowli Junction will be opened in the coming days. Apart from the installation of street light poles, most of the civil works have been completed and the asphalt layer on the flyover has been laid.

Measuring 956m long and 16.60m wide, the Shilpa Layout overpass was built under the state government’s ambitious Strategic Roads Development Plan (SRDP) and has been hailed as an engineering feat by the Hyderabad Municipal Corporation (GHMC).

Some spans of the flyover have been installed approximately 18 meters above ground level and span the existing Gachibowli flyover, making it different from other facilities built to ease traffic.

Once this flyover is available to people, the connectivity from Shilpa Layout to ORR will greatly improve. Other benefits of the project include traffic mitigation at Gachibowli Junction and better connectivity between Hi-Tech City and the financial district.

On the Shilpa Layout road, peak hour traffic is 1,464 passenger vehicles (PCUs) per hour in 2020, and peak hour traffic is projected to be 5,194 PCUs per hour in 2040.

With the flyover soon to open, GHMC has issued a tender for the design, supply, installation, testing and commissioning, including operations and maintenance (O&M), of dynamic lighting decorative lighting on both sides of the Shilpa Layout flyover for a period of five years.

Source link

Telanganapress
  • Website

Related Posts

KCR’s speech gets roaring response from people-Telangana Today

April 16, 2024

More of the same-Telangana Today

April 16, 2024

Property tax cheques bounce, GHMC takes action-Telangana Today

April 16, 2024
Leave A Reply Cancel Reply

Categories
  • 1
  • AI News
  • News
  • Telugu today
  • Uncategorized
  • తాజా వార్తలు
  • వార్తలు
కాపీరైట్ © 2024 Telanganapress.com సర్వ హక్కులు ప్రత్యేకించబడినవి.
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • About us
  • Contact us

Type above and press Enter to search. Press Esc to cancel.